Team Cizek
Bloggin' about building our new home in Keller, TX

Final Inspections, Utility Trim & Fencing

We returned from a great trip to Gulf Shores to find our home even closer to completion. Today’s visit revealed the following have been completed since our last visit before Christmas:

– Electrical fixtures & trim (fans, lights, switches)
– Plumbing trim (tub, shower and sink faucets, water heaters, tub skirt)
– HVAC trim (vents, registers, AC compressors)
– Fencing

We saw the final inspection tags for all trades which basically means that everything is good to go as far as the city is concerned. We are 14 days away from our completion date and everything seems to be right on track. The only things still left are irrigation, flooring, landscaping and cleaning. Here are the pictures from today:

Advertisements

No Responses to “Final Inspections, Utility Trim & Fencing”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: